NERC PRC-005 requirements for battery maintenance when no monitoring
Table 1-4(a)
Protection System Station dc Supply Using Vented Lead-Acid (VLA) Batteries
Maximum
Interval |
Maintenance Activities |
4 Calendar Months | Verify:
Inspect:
|
18 Calendar Months | Verify:
Inspect:
|
18 Calendar Months
-or- 6 Calendar Years |
Verify that the station battery can perform as manufactured by evaluating cell/unit measurements indicative of battery performance (e.g. internal ohmic values or float current) against the station battery baseline.
-or- Verify that the station battery can perform as manufactured by conducting a performance or modified performance capacity test of the entire battery bank. |
Table 1-4(b)
Protection System Station dc Supply Using Valve-Regulated Lead-Acid (VRLA) Batteries
Maximum
Interval |
Maintenance Activities |
4 Calendar Months | Verify:
Inspect:
|
6 Calendar Months | Inspect:
|
18 Calendar Months | Verify:
Inspect:
|
6 Calendar Months
-or- 3 Calendar Years |
Verify that the station battery can perform as manufactured by evaluating cell/unit measurements indicative of battery performance (e.g. internal ohmic values or float current) against the station battery baseline.
-or- Verify that the station battery can perform as manufactured by conducting a performance or modified performance capacity test of the entire battery bank. |
Table 1-4(C)
Protection System Station dc Supply Using Nickel-Cadmium (NiCad) Batteries
Maximum
Interval |
Maintenance Activities |
4 Calendar Months | Verify:
Inspect:
|
18 Calendar Months | Verify:
Inspect:
|
6 Calendar Years | Verify that the station battery can perform as manufactured by conducting a performance or modified performance capacity test of the entire battery bank. |